
Factory Roof Solar
Coordinate the production building, roof zones, structural inputs, equipment locations and PV supply scope from the new-build stage.
PAKISTAN COMMERCIAL PROJECTS
Coordinate the building structure, solar-ready roof or canopy, and commercial PV equipment package through one project team. Built for new factories, warehouses, parking areas and multi-storey commercial developments.


Coordinate the production building, roof zones, structural inputs, equipment locations and PV supply scope from the new-build stage.

Plan usable roof area around drainage, fire clearances, maintenance access, loading operations and future expansion.

Combine the parking structure and PV equipment package while considering vehicle clearance, drainage, lighting and cable routes.

Review usable rooftop area, plant zones, access, load inputs and system interfaces for offices and mixed-use developments.
FIT CHECK
The Fit Check identifies the usable solar area, required structural information, electrical and grid open items, local responsibilities and the appropriate next design stage. It is not a construction design or a promise of grid approval.
Submit Project InformationFinal brands, models, compliance documents, quantities, warranties and availability are confirmed for the specific project and destination before contract.
Share your available project information. If drawings, load data or electricity records are not ready, note what is missing and we will identify the next required inputs.
Our current standard scope does not claim local EPC responsibility. Installation, local professional sign-off, permits, inspection and grid connection must be completed by qualified Pakistan-based parties appointed for the project.
Yes, once the building requirements, PV design basis, responsibility boundary and required equipment scope are sufficiently defined. The quotation must state the included and excluded work clearly.
No. Utility rules, approvals, tariffs and project economics must be confirmed under the current local process. Early project material must not be treated as an approval or financial guarantee.
Yes. The nominated local party can review applicable requirements, site conditions, professional approvals, installation interfaces and grid documentation with the project team.
Send the city, building type and dimensions, roof or parking layout, electricity information, target capacity if known, project stage, schedule and desired supply scope.