
A massive e-commerce fulfillment center with high-bay racking compatibility, multiple loading docks, and automated sorting system integration. Designed for 24/7 high-volume operations.
The client needed a 120,000 sqm distribution center capable of supporting 12-meter high automated racking systems, with 60+ loading docks and floor flatness meeting FM2 standards for AGV operations.
We designed a multi-bay portal frame system with 30m spans and 14m eave height. The floor was engineered to FM2 flatness standards using laser-guided screeding. The structure incorporates rack-supported mezzanine connections and integrated conveyor system supports.
Logistics flow analysis, structural design, MEP
Mass production of portal frames and purlins
Phased delivery to construction site
Erection, roofing, cladding, floor works



Contact us today for a free consultation and quote for your steel structure project.
Get Free Quote