Cold Chain Logistics Warehouse
Back to Projects
Warehouse & Logistics2023

Cold Chain Logistics Warehouse

Jakarta, IndonesiaWarehouse35,000 sqm / 2,100 MT
Location
Jakarta, Indonesia
Building Area
35,000 sqm / 2,100 MT
Industry
Freight & Logistics
Completion
2023

Project Overview

A temperature-controlled cold chain facility with insulated sandwich panel walls and roofing, vapor barriers, and energy-efficient refrigeration support structures for perishable goods storage.

The Challenge

Building a cold chain facility in Jakarta's tropical climate required exceptional thermal performance to maintain -25°C frozen storage and +2°C chilled zones while minimizing energy consumption. The high humidity environment demanded meticulous vapor barrier design.

Our Solution

We engineered a thermally broken steel structure with 200mm PIR insulated panels achieving U-value below 0.15 W/m²K. All structural penetrations were sealed with specialized cold-bridge prevention details. The roof was designed with internal drainage to prevent condensation issues.

Project Highlights

Multi-temperature zones (-25°C to +15°C)
U-value below 0.15 W/m²K
Complete thermal bridge prevention
Internal roof drainage system
Dock shelters with thermal seals
40% energy savings vs. conventional design

Project Timeline

Design & Engineering

8 weeks

Thermal analysis, cold chain engineering

Steel Fabrication

12 weeks

Fabrication with thermal break details

Shipping & Logistics

2 weeks

Sea freight to Tanjung Priok Port

On-Site Erection

10 weeks

Erection, insulation, refrigeration integration

Project Gallery

Cold Chain Logistics Warehouse - 1
View Full Size
Cold Chain Logistics Warehouse - 2
View Full Size

Technical Specifications

Structural System
Thermally Broken Portal Frame
Main Span
24m Clear Span
Eave Height
12m
Temperature Zones
-25°C / +2°C / +15°C
Insulation
200mm PIR (U<0.15 W/m²K)
Floor System
Heated Slab (Anti-Frost Heave)
Loading Docks
24 Docks with Thermal Seals
Steel Grade
Q345B (Low-Temp Grade)

Project Information

Location
Jakarta, Indonesia
Building Type
Warehouse
Area / Steel Weight
35,000 sqm / 2,100 MT
Completion Year
2023
Industry
Freight & Logistics

Interested in a Similar Project?

Contact us today for a free consultation and quote for your steel structure project.

Get Free Quote